pipe-logo

Fantozzi Pipeling Project, September 2015

Project Location: Middle Island, NY.

Duration of Project: 4 Hours.

Project Description:

Zero Dig cured in place Pipe Lining of a 6” sewer line.

The newly installed reinforced Pipe Liner was cured rapidly with steam. 

Our steam cure system reduced cure time to less than one hour.

Installed liner and guaranteed for 50 plus years.

Pipe rehabilitation was done with a Lateral Inversion Unit.

The Host Pipe in need of repair was accessed through a clean out eliminating the need for excavation.

A Reinforced Liner was used making sure there was no chance of stretching or protrusion.

FullSizeRender-(2)-(1)

trailer3

 Perma-Liner-Day-2-and-3-013

Perma-Liner-Day-2-and-3-031

Perma-Liner-Day-2-and-3-041

Perma-Liner-Day-2-and-3-054

Perma-Liner-Day-2-and-3-055

Perma-Liner-Day-2-and-3-074

Perma-Liner-Day-2-and-3-077

Perma-Liner-Day-2-and-3-080

Perma-Liner-Day-2-and-3-092

Perma-Liner-Day-2-and-3-095

Perma-Liner-Day-2-and-3-114

Perma-Liner-Day-2-and-3-122

Perma-Liner-Day-2-and-3-125

Perma-Liner-Day-2-and-3-130

For more information please contact us here.